Everything You Need to Know About Solar Installation in India
1. How Much Does a Solar System Installation Cost?
The cost of a solar system installation in India varies. Typically, a 1 kW system costs between ₹50,000 to ₹80,000 depending on the installation complexities. This can be offset by government subsidies provided by the Ministry of New and Renewable Energy (MNRE).
2. What Are the Incentives for Going Solar in India?
India offers several incentives to promote solar energy:
● Subsidies: MNRE provides subsidies covering up to Rs 78,000 of the cost for residential rooftop systems up to 3 kW and Rs 18,000 per KW up to 500 KW for Housing Societies
● Tax Benefits: Businesses can avail accelerated depreciation benefits.
● Net Metering: This allows you to feed excess power back to the grid and receive credits, reducing your electricity bills.
3. How Long Does It Take to Pay Off the Investment in a Solar Electric System?
The payback period typically ranges from 2 to 5 years, depending on the system size and electricity usage. After this period, you will benefit from significant savings in energy costs.
4. How Do I Know If Solar Will Work for My Home?
Consider the following:
● Roof Orientation: South-facing roofs are ideal.
● Shading: Explore financing options such as loans, leases, and power purchase agreements (PPAs). Additionally, check for government subsidies and incentives that can reduce the upfront cost.
● Space: A 1 kW system requires about 100 square feet of shadow-free area.
5. What Is Net Metering and How Does It Work?
Net metering allows you to send excess solar power to the grid and get credits. This offsets your electricity costs, reducing your overall bill.
6. What Are the Maintenance Requirements for Solar Panels and Inverters?
Solar panels need minimal maintenance. Clean them periodically to remove dust. Inverters might need checks every 5-10 years. Most panels have a 25-year performance warranty, and inverters come with a 5-10-year warranty.
7. Will My Solar System Work During a Power Outage?
Standard grid-tied systems don't work during power outages unless paired with battery storage, which stores excess energy for use when the grid is down.
8. How Long Does the Installation Process Take?
Installation takes 1 to 3 days. However, the complete process, including site assessment and approvals, can take 1 to 3 months.
9. What Is the Procedure to Install Solar Panels at Home in India?
The process includes site assessment, system design, obtaining approvals, installation, and grid connection. This ensures compliance and optimal performance.
10. Do I Need Permission to Install Solar Panels at Home in India?
Yes, permissions from local authorities and your electricity distribution company are required. This includes obtaining a no-objection certificate (NOC) from your housing society.
11. How Much Space Do I Need for Solar Panels at Home in India?
An average residential installation might need around 100 square feet for a 1 kW system. More space allows for more panels and higher electricity generation.
12. What Direction Should Solar Panels Face in India?
Solar panels should ideally face true south to maximize sunlight exposure throughout the day.
13. How Long Do Solar Panels Last, and What Kind of Warranties Are Available?
Solar panels typically come with a 25-year performance warranty and a 10-12 year product warranty to cover any defects.
By addressing these common questions, we provide a comprehensive guide to potential customers, helping them make informed decisions about solar installations in India. For more information or to start your solar project, contact us at: